Mendeleevets-MGB – deep, block silicon iron anodes

Mendeleevets-MGB
Included in the registers:
Included in the register of GAZPROM Included in the register of TRANSNEFT

Certification:

Certified in the EAC Certified in the INTERGAZCERT Certified in the TRANSNEFT Favourable decision of a Sanitary-hygienic Commission of Experts 100 best products 2017

Application area

MGB

Deep block groundbeds Mendeleevets-MGB are used to be installed into boreholes in such areas where the upper layers of the soil with the capacity more than 5 m have electrical resistivity more than 100 Ohm∙m and in areas with dense building or with limited access for anodic field.

1 - silicon iron electrode;
2 - connecting cable;
3 - gas outlet tube;
4 - body of the block;
5 - holder

Technical details

MGB

Deep block groundbeds Mendeleevets-MGB are worked out as an alternative to heavier and bigger deep groundbeds Mendeleevets-MG.

The construction of the block groundbed was noticeably remade and simplified in order to unify the installation works. And at the same time the working element of the groundbed (silicon iron electrode) remained the same.

Each block of the groundbed includes one section with the silicon iron electrode inside. Current distribution to the block of the groundbed is provided through the connecting cable.

The kind of deep ground, consisting of groundbeds Mendeleevets-MGB (quantity of blocks in a borehole, quantity of boreholes, distance between boreholes, etc.) is determined by the project of cathodic protection.

The design provided for connection of blocks into the chain. It allows to raise current loading and to reduce transitional resistance. Connection of blocks into the chain is realized when installing groundbeds into the borehole and consists in attachment of blocks to each other with the help of a holder. Maximum quantity of the deep groundbed blocks of Mendeleevets-MGB which can be installed into a borehole is 20 pieces.

Gas that is formed while working of deep groundbed is drawn outside to the surface through the gas outlet tube. The gas outlet tube has perforation along all the height of the chain and is delivered for the the concrete order on the basis of one tube for one chain of groundbeds installed in the borehole. The length of the gas outlet tube is equal to the depth of the borehole.

The hollow space around the anode should be filled with a coke-mineral activator (KMA) produced by Chemservice in order to reduce spreading resistance of anodic current and to slow down anodic dissolution.

MGB

Technical data

Parameter nameValue
Max current load, A, not more than 7,3
Anodic dissolution rate, kg/(A∙year), no more than 0,3
Dimensions of electrode working surface, mm:
- Length (height)
- Diameter

1385
85
Assembled anode dimensions , mm, no more than:
- length (height)
- diameter

1750
130
Nominal anode weight, kg 43
Assembled anode weight, kg, no more than 55
Max quantity of groundbed blocks in the borehole, pieces, no more than 20
Service lifetime, years, no less than 35

Delivery set